A drilling technique used to drill without returns while balancing a full annular fluid column by using a Light Annular Mud (LAM) cap maintained above an open-hole formation that is taking all injected (sacrificial) fluid and drilled cuttings assisted by surface pressure. The LAM density is chosen based on ability to make LAM and the desired surface pressure that can be maintained and observed. Periodically injecting more of the same fluid into the annulus provides a means to control the surface back-pressure within the operating limits of the RCD and/or riser system.
Variation of MPD, drilling with no returns to surface where an annulus fluid column, assisted by surface pressure, is maintained above a formation that is capable of accepting fluid and cuttings. A sacrificial fluid with cuttings is accepted by the loss circulation zone. Useful for cases of severe loss circulation that preclude the use of conventional wellbore construction techniques.
In general, good operating practice calls for regaining circulation before drilling ahead. However, in some companies, there is one notable exception: mud cap drilling. Mud-cap drilling permits continued drilling despite a pressured formation and a lost-circulation zone in the same interval of the open hole. Although mud-cap drilling has been employed in a limited manner in many oil and gas companies.
Mechanism
Drilling with a floating mud cap involves drilling ahead blind (i.e., without returns) by simultaneously pumping different fluid densities down the drill string and annulus. All fluid is lost to the thief zone. Figure B.4 illustrates this procedure, indicating the intervals exposed during the mud-cap drilling operation. Employing a mud cap in this manner allows continued drilling to the following casing setting depth, if circulation cannot be regained.
Note: Drilling with a mud cap through hydrocarbon-bearing reservoirs is not recommended, as the well kick may not be controlled from the surface (resulting in an underground blowout).
Application Of Mud Cap Drilling
This technique is utilized because some troublesome intervals must be penetrated and cased due to well-planning considerations. For example, the Wasia group (in Saudi Arabia – SA Oil History) consists of limestones, shales, and sands. Some of these shales can be highly water-sensitive. In addition, some permeable members of the Wasia can be abnormally pressured. Compounding these drilling complications is the Shu’aiba limestone, which underlies the Wasia group and is subnormally pressured and highly permeable. Given this situation, conventional drilling practice would suggest running and cementing casing at the top of the Shu’aiba but employing mud-cap drilling permits drilling to continue to the top of pay.
As noted above, the shale members of the Wasia can be highly water-sensitive. Contact with water or high fluid loss mud can cause them to swell rapidly and slough, resulting in a stuck pipe problem. Therefore, it is a drilling imperative that water not be permitted to contact the Wasia shales. An added complication is that some permeable sand members of the Wasia can be abnormally pressured, requiring mud densities ranging between 10 ppg and 13 ppg to contain them, with the norm around 12 ppg. Massive water flows evidence this abnormal pressure.
If unchecked, water flows from the Wasia would produce sloughing of water-sensitive shales situated above and below the Wasia sand members. Since the Shu’aiba is subnormally pressured, an inexpensive low-density fluid is required to drill it. In practice, fresh water (drill water) is used to drill through the Shu’aiba, and low-solids, non-dispersed mud is used to mud-cap the Wasia. The mud-cap mud is virtually untreated and is thus relatively inexpensive for its density. Ideally, in such a technique, water is the only fluid to contract the Shu’aiba, and mud-cap fluid is the only fluid to contact the Wasia.
Mud Cap Drilling Procedure
A general description of the typical mud-capping procedure follows:
1. As drilling progresses, water is pumped down the drill pipe to remove cuttings from beneath the drilling bit and around the bottomhole assembly.
2. These cuttings and the water are lost to the lost circulation zone. Meanwhile, the mud of a density sufficient to kill the pressured zone is pumped slowly into the annulus. Thus, a critical balance of pressure control is maintained.
3. Field experience shows us that the premixed mud-cap mud barrels will be pumped down the annulus when circulation is lost to the troublesome zone.
4. Drilling proceeds blind (i.e., no returns), pumping water down the drill string and adding mud down the annulus every hour.
5. If partial or complete returns are regained while drilling, the mud pumps are shut down to determine whether the well is flowing or if partial circulation has been restored.
6. Suppose it is determined that partial circulation is the case. In that case, the circulation loss zone is intentionally broken down by squeezing mud down the annulus to avoid drill water contacting any water-sensitive shales.
7. On the other hand, if the well flows, the mud cap does not provide sufficient hydrostatic pressure. The remedy is either to increase the mud density or increase the frequency of the mud addition down the annulus. This assumes the reduction of hydrostatic pressure is due to more significant mud losses per hour than initially anticipated.
8. Before any trip, the drill pipe is displaced with mud-cap mud.
9. During a trip, 10 barrels of mud-cap mud are added every ten stands or every 30 minutes, whichever is less. While the pipe is out of the hole, 10 barrels of mud-cap mud are pumped down the hole every hour. Also, all these numbers can be modified according to field experience.
PMCD Provides a Constant BHP
Advantages & Disadvantages:
Limitations of PMCD
There are several limitations of PMCD. It requires a subsurface zone that can take the cuttings and the drilling fluid used to drill that section for a prolonged period of time. Large reserves of sacrificial fluids are needed along with sufficient quantities of mud cap fluid.
Regulatory and logistics requirements must be available before the operations are performed. PMCD does require specialized and trained people.
When it comes to the selection of mud cap fluid, a fluid suitable for PMCD should be no damaging to the matrix; not form damaging or blocking emulsions with either reservoir crude, reservoir water, or drilling fluid; be inexpensive; be easy to weight up at the rig site based on the required density changes during drilling, tripping and other rig operations; be mixable in high volumes; have low rheology for normal drilling; and have high downhole rheology under the mud cap to minimize mixing with the reservoir fluid.
Success Stories of PMCD:
Conclusion
Mud Cap Drilling is a mix of art and science, requiring diligent monitoring. A stuck pipe could result if the pump rate down the drill string is too low. Also, if pump rates down either side are excessive, mud losses and mud expenses can become prohibitive. Conversely, if either injection rate is insufficient, the well could kick. Also, PMCD facilitated drilling under sudden total losses minimizing the mud consumption, reducing time/cost, and avoiding uncontrolled release of hydrocarbons.